tweeter facebook linkedin
Seaport Enhanced Contract  
.
Functional Area 10: Configuration Management (CM) Support

e-Services: Expertech tailored its standard software CM plan template to be consistent with e-Services CM Plan template to support the e-Services project multiple simultaneous baselines. We placed under configuration management and control Change Requests, and the artifacts called for in the ELC. In addition, Expertech supported the maintenance of e-Service configuration management of e-Services baseline system configurations and updates for the deployed systems; perform periodic configuration audits; review the Configuration Identification Index (CII), CM Worksheet, and the CM Repository.

MeF: Expertech guaranteed that base lined ELC artifacts, including acquisition strategy; project plan; systems requirements; systems architecture; logical design; physical design; development test and integration test plans; security and privacy plans, security test; and deployment and transition plans were kept under configuration management. Also, Expertech prepared justifications and waiver requests for changes to any of the artifacts; and presented any proposed changes to the IRS Configuration Management Board.


Afilon Capabilities/Experience
FA-2
Engineering, System Engineering and Process Engineering Support
FA-3
Modeling, Simulation, Stimulation, and Analysis Support
FA-10
Configuration Management (CM) Support
FA-11
Quality Assurance (QA) Support
FA-12
IS/IA/IT - Information System (IS) Development, Information Assurance (IA), and Information Technology (IT) Support
FA-15
Measurement Facilities, Range, and Instrumentation Support
FA-20
Program Support

To top